Back to Projects
Planning
Ha Mabote to Tweepruit Transmission Line Upgrade (132kV to 275kV, designed at 400kV)
Lesotho• Southern AfricaPower & Energy
Project Description
Transmission line upgrade from Ha Mabote (Maseru) to Tweepruit (Bloemfontein), upgraded from 132kV to 275kV and designed at 400kV for future needs. This is the most urgent of several domestic and cross-border transmission lines needing construction. Actual identification of additional lines can be done upon visit and discussion with the utility (LEC).
Project Details
Estimated Value
TBD
Contact Information
African Transformation Union
curtis@atu.group